翻訳と辞書
Words near each other
・ Sabujpatra
・ Sabujá language
・ Sabuk
・ Sabuktigin
・ Sabula Rail Bridge
・ Sabula, Iowa
・ Sabule
・ Sabuli
・ Sabulodes
・ Sabulodes aegrotata
・ Sabuloglossum
・ Sabun
・ Sabun River
・ Sabun, Somalia
・ Sabunchi
Sabuncubeli Tunnel
・ Sabuni
・ Sabunlar, Devrek
・ Sabunçu
・ Sabunçu raion
・ Sabunçu, Baku
・ Sabunçu, Zaqatala
・ Sabur
・ Sabur ibn Ardashir
・ Sabur Printing Press
・ Sabur-e Bozorg
・ Sabur-e Kuchek
・ Saburi
・ Saburi Biobaku
・ Saburlar, Alanya


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Sabuncubeli Tunnel : ウィキペディア英語版
Sabuncubeli Tunnel

The Sabuncubeli Tunnel ((トルコ語:Sabuncubeli Tüneli)) is a road tunnel under construction located on the Mount Sipylus ((トルコ語:Spil Dağı)) in Aegean Region as part of the Manisa-Izmir highway in Turkey.
Situated near Kocakara village in the northeast and Beşyol village of Bornova district in the southwest on the province border of Manisa and Izmir, the twin-tube tunnel is long carrying two lanes of traffic in each direction. In 2011, the Manisa-Izmir route had a daily traffic rate of 30,000 vehicles. The tunnel is being built to bypass the steep and twisty route at Sabuncubeli Pass, reducing the grade of highway from 7–8% to 1.5%. When completed, it will shorten the travel time between Manisa and Izmir from 45 minutes to 15 minutes, and will contribute to elimination of traffic congestion in the winter time.〔〔〔〔〔〔〔〔〔
The contract for the building of the tunnel was awarded to Koçoğlu and Makimsan Consortium on the build-operate-transfer basis, and was signed on August 18, 2011.〔〔〔〔 It was projected that the -long tunnel was to be finished within three years costing 110 million.〔〔 The groundbreaking ceremony took place in presence of Minister of Transport, Maritime and Communication Binali Yıldırım on September 9, 2011.〔〔 The construction works were suspended for seven months right after the groundbreaking in order to undertake a revision in the tunnel project. The new project featured the extension of the tunnel length from initially planned to ,〔〔〔 and a lesser road grade than of previously designed.〔 The tunnel runs in average underground with a maximum depth of .〔 Excavation works continue at a daily rate of with a total of 150 personnel.〔 The estimated cost was revised to 150 million.〔
A landslide, which occurred in the western tube on the northeast portal during the excavation works in 2013, caused the lengthening of the tunnel to now ,〔〔 and hence a delay in the construction's completion. The tunnel opening is postponed from 2015 to end 2016.〔〔
The constructing company has the concession to operate the tunnel for a time span of 11 years 11 months and 11 days after its opening, and to collect the Turkish lira equivalent of US$2.50 as toll.〔〔
==Critism==
Hasan Sözbilir, professor at Dokuz Eylül University and member of the Izmir Branch of the Chamber of Engineering Geology, warned at a press conference in December 2012 that the Sabuncubeli Tunnel is situated entirely on one of the fault zones in the region. He added that structural measures have to be taken to prevent any damage in case of an earthquake.〔

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)